01 - Project Setup ​

Project setup determines how much chaos you buy later. Enterprise-grade delivery starts before the first feature branch.

Objectives ​

The setup phase should produce:

  • a shared understanding of the problem
  • explicit constraints and success measures
  • a baseline architecture and delivery model
  • initial controls for security, testing, documentation, and release

Step 1: Define The Product Frame ​

Write a short project charter that covers:

  • problem statement
  • target users and stakeholders
  • business goals
  • out-of-scope items
  • success criteria

Success criteria should include functional outcomes and operational expectations.

Examples:

  • checkout completion rate
  • response time targets
  • uptime target
  • recovery expectations
  • compliance obligations

Step 2: Identify Constraints Early ​

Document constraints before selecting tools:

  • regulatory and privacy requirements
  • budget and staffing limits
  • integration dependencies
  • required delivery dates
  • data residency or tenant isolation needs

Teams that skip this often pick a stack first and spend months working around it.

Step 3: Define Non-Functional Requirements ​

Capture the baseline expectations for:

  • availability
  • performance
  • security
  • scalability
  • observability
  • maintainability

These do not need to be perfect on day one, but they must be explicit.

Step 4: Choose A Delivery Model ​

Decide how changes will move through the system:

  • branch strategy
  • review requirements
  • CI baseline
  • release strategy
  • environment model
  • incident and rollback ownership

This is part of product setup, not something to improvise later.

Step 5: Select The Initial Architecture ​

Pick the smallest architecture that meets current requirements.

Common default:

  • modular monolith
  • relational database if transactions matter
  • background job runner for async work
  • object storage for files
  • one deployment unit unless scale or risk justifies more

Choose technologies based on:

  • team capability
  • ecosystem maturity
  • hiring and maintenance cost
  • operational fit

Avoid hard-coding the playbook to one frontend, backend, proxy, or hosting preference.

Step 6: Establish Repository Standards ​

At minimum, initialize:

  • README.md
  • CONTRIBUTING.md
  • SECURITY.md
  • .gitignore
  • lockfile
  • scripts for build, test, lint, and local startup
  • code formatting and lint rules
  • branch protection in the remote repository

If you use AI collaboration docs such as .ai/, treat them as additive context, not as a replacement for standard engineering artifacts.

Step 7: Create Initial Architecture Records ​

Before implementation, create:

  • system context summary
  • service and dependency inventory
  • first ADRs for major technology and topology choices
  • data classification notes for sensitive domains

Step 8: Prepare The Security Baseline ​

Set the default controls now:

  • secret handling approach
  • access model for environments and repos
  • dependency update policy
  • vulnerability triage owner
  • audit and logging expectations

At minimum, ensure secrets are not stored in source control and access is least privilege by default.

Step 9: Prepare The Testing Baseline ​

Define which checks are required before merge:

  • type checks
  • lint
  • unit tests
  • integration tests where needed
  • build verification

For higher-risk systems, include:

  • contract tests
  • security scanning
  • accessibility checks
  • performance smoke tests

Step 10: Define Release Readiness From Day One ​

Before shipping the first feature, know:

  • how deployments happen
  • how to roll back
  • how to verify health
  • who is paged if it breaks
  • where runbooks and dashboards live

If you cannot answer these questions early, the project is accumulating operational debt immediately.

Setup Deliverables ​

By the end of setup, you should have:

  • project charter
  • initial ADR set
  • repository standards in place
  • CI baseline
  • environment plan
  • security and documentation owners
  • first backlog with acceptance criteria

Exit Criteria ​

Setup is complete when:

  • goals and constraints are explicit
  • the delivery model is defined
  • the repository enforces baseline quality controls
  • the team knows how code reaches production safely